| Job title | Employer | Year |
Works performed
|
Payment
(in 1000 E)
|
|
Dams of river Nestos: Thesavaros Dam
|
DEH (Public Company
of Electricity)
|
1990-
1994
|
Quality control of the earth dam and other civil
engineering works
|
500 |
|
Services
of Geotechnical Consulting
of the works of the Nornos and Iliki aquifers
|
EYDAP (Water Supply
Public Company of Athens)
|
1990-
1994
|
Geotechnical
reconnaissance, geotechnical studies
and proposals for geotechnical investigations
|
261 |
| Devolopement of Jiddah Island, Bahrain | Government of Bahrain | 1991 |
Geotechnical reconnaissance and study
of measures increasing the stability of rock
slopes
|
50 |
|
Underground
parking of the Athens
Concert Hall
|
Organization of Athens
Concert Hall
|
1992-
2001
|
Geotechnical Investigations and design
of the
retaining wall required for stability during
construction. Quality control during the construction
|
180 |
| Analysis of
the seismic vulnerability
and seismic design of the commercial
triangle of Athens
|
National Technical University
of Athens,
Urban Planning
Department
|
1992 |
Collection of geotechnical
data and dynamic analyses
for microzonation study
|
50 |
|
Services
of Geotechnical
Consulting for Athens Metro
|
Athens Metro Co | 1993-
1995
|
Geotechnical and geodynamic
calculations
|
60 |
|
Section
Derveni-Profitis of
Egnatia Road
|
Ministry of Public
Works
|
1993-
1995
|
Geotechnical Investigations
and geotechnical design of the
engineering
works
|
473 |
| New high-speed rail line
Athens-Thessaloniki,
Platamonas Region
|
OSE (Organisation
of railways of Greece
|
1994-
1996
|
Geotechnical
Investigations and
study of the dynamic effects in the
Platamonas castle
|
349 |
| Extension of line 2 to Peristeri | Athens Metro Co | 1997-
1999
|
Geotechnical Investigations | 264 |
|
Preloading study at Section Derveni-
Profitis of Egnatia Road
|
Egnatia Road Co. | 1998 |
Study of soil improvement to
decrease embankment settlements
and protection from liquefaction
|
147 |